Piles of piles and boxing going in
So, the official tally of piles driven into the ground is "shitloads"

(Pictured; shitloads)

(Pictured, boxing, young guy, laser level (fancy pants))
(Pictured; shitloads)
We're not 100% sure how many were budgeted or planned for, so hopefully it was close to "shitloads" or it's gonna cost us a butt-tonne of cash.
Also on today's flying visit (they've always been flying visits so far Cos there hasn't really been much to see) there was a couple of young guys installing the boxing for the slab
(Pictured, boxing, young guy, laser level (fancy pants))
So the process is honking along now. Hopefully we should have concrete poured. Choice.